Glen Aspen crest

Glen Aspen

Overview

Operating mode
deferred maintenance
Why now: No strong mode signals detected.
Top recommendations
Burn down high-priority backlog
Start with high risk and high leverage maintenance items.
Recover recurring cadence
Catch up overdue recurring tasks to reduce drift.
Refine next trip scope
Convert vague maintenance items into trip-ready objectives.

Weather

Tempest-driven conditions plus forecast and risk context for the property.

Source: weather
Current Temp

--

Wind

--

Wind Gust

--

Humidity

--

Pressure

--

Now

Loading

WEATHERNo weather snapshot yet
Live forecast will populate here once the weather feed responds and the mountain decides to cooperate.

What Should I Do Today?

Less wall of cards, more clear next move. The best action goes first, the rest stay within reach.

Mediumconsider

Verify source, pressure, and storage behavior

Water system needs attention.

Low
Good candidate work
Low-risk work includes organizing, hauling trash, documenting conditions, and checking systems.

Today Engine

A blunt recommendation layer so the dashboard tells you what to do, not just what exists.

good
Good day to make real progress. Prioritize the obvious wins and do not invent side quests.
Do first

Nothing notable here right now.

Good filler work

Verify source, pressure, and storage behavior

Good candidate work

Do not force it

Nothing notable here right now.

System Status

Priority-ranked operating signals from property systems and open-data feeds.

warningConfidence medium
Needs attention now

Fire Risk

Weather feed needed to estimate current exposure.

Unknown

Tempest Station

Waiting for the first successful Tempest station pull.

Unknown
Property systems

Fire Risk

Unknown

Weather feed needed to estimate current exposure.

Tempest Station

Unknown

Waiting for the first successful Tempest station pull.

Healthy signals (3)

Water System

Awaiting live weather inputs for freeze and operating context.

Monitor

Road / Access

Historical note: ruts remain in some sections.

Fair

Connectivity

Starlink installed. Map layer support coming next.

Online
External intel

Twin Assessments

Rule-based judgments built from current weather, alerts, and property mode.

Pending

Fire Risk

good

Fire conditions are relatively manageable.

Freeze Risk

good

Freeze risk is currently low.

Wind Workability

good

Wind conditions are workable.

Water System

warning

Water system needs attention.

  • House water is not currently pressurized.
Recommended actions
  • Normal outdoor work is reasonable.
  • No immediate freeze action needed.
  • Verify source, pressure, and storage behavior before relying on the system.

Control deck

Fast system toggles and route health without making you spelunk through the whole app.

warning
Operating profile
Live property state
Route health

Property loading

Tasks loading

History loading

Map summary loading

Intel loading

Knowledge loading

Trip Readiness

The one-number answer to whether heading up is smart, dumb, or somewhere awkward in between.

good
Readiness
80
Go

Green light for a productive trip.

Conditions look relatively calm. The mountain is behaving for once.

Season Planner

Spring Open-Up in focus. Next up: Summer Maintenance.

good
Season readiness: 100/100
Due This Season
0 open items aligned to spring.
Nothing flagged.
Overdue From Prior Season
0 items carried forward.
Nothing flagged.
Upcoming Next Season
0 items likely to matter next season.
Nothing flagged.
Annual Items Due Soon
0 annual or yearly items due soon.
Nothing flagged.
Runoff/opening season: prioritize startup + post-winter inspection.

Budget + Cost Intel

Project estimates, spend, confidence bands, and defer-vs-fix-now exposure.

$23,000 deferred
Total estimate
$15,000
Spent / remaining
$0 / $15,000
Water System / Well Work
Est $6,200 • Spent $0 • Remaining $6,200
Band (medium) $0 - $15,130
deferred
Siding Reseal
Est $4,300 • Spent $0 • Remaining $4,300
Band (medium) $680 - $7,920
deferred
Driveway Road Base
Est $3,600 • Spent $0 • Remaining $3,600
Band (low) $0 - $7,370
deferred
Septic Roto-Root
Est $900 • Spent $0 • Remaining $900
Band (medium) $0 - $1,860
deferred
Highest defer exposure: Water System / Well Work - Pump/tank remediation reserve. Fix now $4,800 vs defer exposure $7,600.

Risk Register + Watchlist

Persistent operational risks independent of task churn.

0 active
What could bite next?
No active risks are currently registered.
Active
0
Critical
0
Reviews due
0
Mitigation avg
0%

Suggested moves

Condition-driven follow-ups that keep the app feeling helpful instead of decorative.

Quick add
Verify water source reliability, storage behavior, and house pressure before depending on the system.
Priority Medium
Use calm windows for organizing, documentation, and low-risk cleanup.
Priority Low